- The government has announced a Rs 2,814-crore incentive scheme for establishing lithium and nickel processing plants.
- The scheme will run from FY27 to FY31 and offers a 30% capital subsidy for the establishment of four plants.
- Under the scheme, two lithium processing plants with a capacity of 30 kilotonnes (kt) each and two nickel processing plants with a capacity of 50 kt each will be established.
- Beneficiaries will be selected through a two-stage process, starting with technical qualification followed by financial bidding.
- The incentives will be disbursed in three tranches linked to the achievement of specified project milestones.
- The maximum capital support will be capped at Rs 500 crore per lithium beneficiary and Rs 900 crore per nickel beneficiary.
- The processing facilities will convert lithium and nickel ores into high-purity compounds for sectors including electric mobility, battery energy storage systems, electronics, defence, and speciality steel.
- Currently, there is a Rs 1,500-crore incentive scheme for critical mineral recycling, but no comparable support exists for processing freshly mined ore into value-added materials.
India's Union Cabinet has launched a Rs 2,814-crore incentive scheme to enhance domestic processing of lithium and nickel, crucial for the battery and defence sectors. This initiative aims to reduce the country's reliance on imports and bolster its position in the global battery supply chain.1
The scheme, approved on November 4, will be implemented over five years from FY27 to FY31, providing a 30% capital subsidy for setting up four processing plants—two for lithium and two for nickel. Each lithium plant will have a minimum capacity of 30 kilotonnes (kt), while nickel plants will have a capacity of 50 kt.23
The maximum capital support is capped at Rs 500 crore per lithium beneficiary and Rs 900 crore per nickel beneficiary. Beneficiaries will be selected through a two-stage process, prioritizing companies seeking the lowest capital expenditure support. The incentives will be disbursed in three tranches linked to project milestones.456
These processing facilities will convert ores into high-purity compounds, catering to sectors such as electric mobility, battery energy storage systems (BESS), electronics, defence, and speciality steel. This initiative complements an existing Rs 1,500-crore scheme for critical mineral recycling, addressing the gap in support for processing freshly mined ore into value-added materials.7
“The scheme offers a 30% capital subsidy for four plants—two lithium (30 kt each) and two nickel (50 kt each)—with support capped at Rs 500 crore per lithium beneficiary and Rs 900 crore per nickel beneficiary. Beneficiaries will be chosen via least-cost bidding, with incentives paid in three tranches tied to milestones.”











